Project preview: New Beiersdorf Campus


Beiersdorf New Headquarters

view facade

view steel

plan steel

RAICO system details

detail base facade

detail louvre window

This construction project involves the expansion / new construction of the Beiersdorf Group headquarters in Hamburg.

IMC has received an order from our new customer for 3 half-timbered bridges that will connect the new building with the existing buildings. These are steel truss bridges with a glass façade (RAICO). IMC is already involved in the design planning and static calculation of the project. In the following, the bridges are constructed as 3D models and the complete drawing package is created. The scope of planning also includes sheet metal cladding and attic construction.

Bridge 1 and Bridge 2 have a length of approx. 9m and a difference in altitude must be overcome with a staircase inside the bridge. A lift for wheelchairs is to be installed next to the stairs. Bridge 3 is approx. 15 m long.

We are currently in the design phase (2D planning and 2D details) of Bridge 3. The findings can be used in planning for Bridges 1 and 2.

 

Picture: Beiersdorf New Headquarters


 

News

18.10.2023We've moved!

In mid-October, we moved into our new office space in Leipzig-Zentrum-Süd. You can now reach us at Münzgasse 28, 04107 Leipzig. All other contact...[more]


30.06.2023Group dynamics on the treadmill - Leipzig Company Run 2023

This year, the IMC once again presented its moving group dynamics at the Leipzig Company Run on 28 June. Our team, consisting of experienced runners...[more]


26.06.2022Leipzig's Company Run - IMC remains sporty

On 22.06.22 more than 12,000 people from all over Leipzig and the surrounding area came together for the SchnelleStelle.de Company Run Leipzig - and...[more]