The designers and structural engineers of the IMC are highly competent, flexible, motivated and deliver their assigned work on time and with demonstrable quality.
News11.06.2020 Project preview: New Beiersdorf Campus![]() This construction project involves the expansion / new construction of the Beiersdorf Group headquarters in Hamburg. IMC has received an order from our new customer for 3 half-timbered bridges that will connect the new building...[more] Category: Aktuelles 12.08.2019 New project started: VW Wolfsburg power plant![]() At the end of July a new IMC project for steel construction planning of a stage in the VW Wolfsburg power plant started. For approx. 190t steel construction, steel construction overviews for approval, steel workshop drawings,...[more] Category: Aktuelles 08.07.2019 Project start ACPS Ingersheim, production hall![]() In the Ingersheim industrial area, ACPS Automotive GmbH will build its new headquarters and development center. The range of services IMC includes: - Preparation of the steel workshop drawings - Assembly summaries - lists of...[more] Category: Aktuelles 26.06.2019 Leipzig's company run 2019. IMC's running well.![]() IMC Planungsgesellschaft mbH took part again in Leipzig's company run on 19 June 2019 with a total 10 runners!Photos: Pictures of the schnelleStelle.de company run 2019 in Leipzig [more] Category: Aktuelles 13.06.2019 Order Extension Moscow GES-2![]() In Moscow, an old power plant is being converted into an event location. As part of the order processing, we have already completed the complete construction of the roof. In the course of the extension of the order, we are...[more] Category: Aktuelles 03.06.2019 Major project ARIANE 6 successfully completed![]() In May 2019, the large-scale project ARIANE 6 for the space center Korou, which was awarded to IMC in 2016, was successfully completed. The project consisted of steel construction design for a total of 6,800 tonnes of steel...[more] Category: Aktuelles 01.04.2019 Further training at a subsidiary![]() IMC team in Ukraine has acquired a new qualification in engineering design. In March 2019, a Ukrainian employee completed the certification as planning engineer of the 1. Category expands the opportunities for IMC to participate...[more] Category: Aktuelles 28.03.2019 Project planning: new building hot dip coating line![]() A production complex with a length of 370 m, maximum approx. 90 m width and maximum approx. 67 m high.Order size: approx. 7,400 t steel structure workshop planning incl. connection static calculations.[more] Category: Aktuelles 01.03.2019 Project car park IKEA Kiel completed![]() In March 2019, IMC successfully completed the new building IKEA Kiel car park project. The steel construction planning included connection statics, workshop planning for car park and ramp with total tonnage of approx. 575t for...[more] Category: Aktuelles 17.12.2018 Company Christmas Party 2018![]() The Leipzig IMC staff and invited former colleagues celebrated yearly successes with sporting achievements in a cozy atmosphere with subsequent meeting with nice entertainment and good food. [more] Category: Aktuelles |